Base Coats
Mixing

Job Conditions
Storage


Drying Time*


Working Time
Time to Attach Insulation Board
Bond Strength (ASTM D-897)
 
Water Vapor Transmission
Flexibility
 
Clean Up
Coverage
 
Enermix
Mixing Requried
Add Portland Cement
40° F or > for 24 Hours
Store 40° F or >
Tightly sealed containers
Out of direct sunlight
Set: 24 Hours

Protect from Rain: 24 Hours
1 Hour
 
60 psi: Gypsum Sheathing
160 psi: Concrete Block


 
With Water while Wet
120 sq ft per pail
 
Enermix Dry
Mixing Required
Add Water
40° F or > for 24 Hours
Store 40° F or >
Tightly sealed containers
Out of direct sunlight
Set: 24 hours

Protect from Rain: 24 Hours
1 Hour
 
Gypsum Sheathing: 60 psi
Concrete Block: 160 psi


 
With Water while Wet
110 sq ft per bag
 
NonCem
No Mixing
Add NO Water!
45° F or > for 48 Hours
Store 40° F or >
Tightly sealed containers
Out of direct sunlight
Set: 24 Hours

Protect from Rain: 24 Hours





Flexible and chip resistant.
 
With Water while Wet
175 sq ft per pail
 
EnerFast
Mixing Required
Add Water
40° F or > for 24 Hours
Store 40° F or >
Tightly sealed containers
Out of direct sunlight
Set: 2 Hours

Protect from Rain: 12 Hours
1 Hour
 
60 psi (gypsum sheathing)
160 psi (concrete block).


 
With Water while Wet
110 sq ft per bag