Compare Base Coats
Base Coats
Mixing
Job Conditions
Storage
Drying Time*
Working Time
Time to Attach Insulation Board
Time to Attach Insulation Board
Bond Strength (ASTM D-897)
Water Vapor Transmission
Flexibility
Clean Up
Coverage
Enermix
Mixing Requried
Add Portland Cement
Add Portland Cement
40° F or > for 24 Hours
Store 40° F or >
Tightly sealed containers
Out of direct sunlight
Tightly sealed containers
Out of direct sunlight
Set: 24 Hours
Protect from Rain: 24 Hours
Protect from Rain: 24 Hours
1 Hour
60 psi: Gypsum Sheathing
160 psi: Concrete Block
160 psi: Concrete Block
With Water while Wet
120 sq ft per pail
Enermix Dry
Mixing Required
Add Water
Add Water
40° F or > for 24 Hours
Store 40° F or >
Tightly sealed containers
Out of direct sunlight
Tightly sealed containers
Out of direct sunlight
Set: 24 hours
Protect from Rain: 24 Hours
Protect from Rain: 24 Hours
1 Hour
Gypsum Sheathing: 60 psi
Concrete Block: 160 psi
Concrete Block: 160 psi
With Water while Wet
110 sq ft per bag
NonCem
No Mixing
Add NO Water!
Add NO Water!
45° F or > for 48 Hours
Store 40° F or >
Tightly sealed containers
Out of direct sunlight
Tightly sealed containers
Out of direct sunlight
Set: 24 Hours
Protect from Rain: 24 Hours
Protect from Rain: 24 Hours
Flexible and chip resistant.
With Water while Wet
175 sq ft per pail
EnerFast
Mixing Required
Add Water
Add Water
40° F or > for 24 Hours
Store 40° F or >
Tightly sealed containers
Out of direct sunlight
Tightly sealed containers
Out of direct sunlight
Set: 2 Hours
Protect from Rain: 12 Hours
Protect from Rain: 12 Hours
1 Hour
60 psi (gypsum sheathing)
160 psi (concrete block).
160 psi (concrete block).
With Water while Wet
110 sq ft per bag