Compare Products
Base Coats
Mixing

Job Conditions
Storage


Drying Time*


Working Time
Time to Attach Insulation Board
Bond Strength (ASTM D-897)
 
Water Vapor Transmission
Flexibility
 
Clean Up
Coverage
 
Enermix
Mixing Requried
Add Portland Cement
40° F or > for 24 Hours
Store 40° F or >
Tightly sealed containers
Out of direct sunlight
Set: 24 Hours

Protect from Rain: 24 Hours
1 Hour
 
60 psi: Gypsum Sheathing
160 psi: Concrete Block


 
With Water while Wet
120 sq ft per pail
 
Enermix Dry
Mixing Required
Add Water
40° F or > for 24 Hours
Store 40° F or >
Tightly sealed containers
Out of direct sunlight
Set: 24 hours

Protect from Rain: 24 Hours
1 Hour
 
Gypsum Sheathing: 60 psi
Concrete Block: 160 psi


 
With Water while Wet
110 sq ft per bag
 
NonCem
No Mixing
Add NO Water!
45° F or > for 48 Hours
Store 40° F or >
Tightly sealed containers
Out of direct sunlight
Set: 24 Hours

Protect from Rain: 24 Hours





Flexible and chip resistant.
 
With Water while Wet
175 sq ft per pail
 
EnerFast
Mixing Required
Add Water
40° F or > for 24 Hours
Store 40° F or >
Tightly sealed containers
Out of direct sunlight
Set: 2 Hours

Protect from Rain: 12 Hours
1 Hour
 
60 psi (gypsum sheathing)
160 psi (concrete block).


 
With Water while Wet
110 sq ft per bag
 
These comparison points are generalizations with many caveats.
Drying Time for instance is given for average drying conditions (70° F, 55% R.H.).
Before choosing a product, please use "Read More" buttons and view detail sheets for more comprehensive information.

15 Year Manufacturer's Warranty Available
Apply before your job starts
Warranty Form or call 1-888-EIFS-INC. (343-7462)